U-MIX® Mortar Mix
60 lb / 80 lb
#67743 / #67731
|
|
NUMBER OF 60LB BAGS OF U-MIX MORTAR MIX REQUIRED TO LAY 8″ STANDARD BLOCKS WITH ⅜” JOINTS
NO. OF BLOCKS | 8 | 16 | 24 | 32 | 40 | 48 | 100 | 200 | 448 |
NO. OF BAGS | 1 | 2 | 3 | 4 | 5 | 6 | 13 | 25 | 56 |
NUMBER OF 60LB BAGS OF U-MIX MORTAR MIX REQUIRED TO LAY STANDARD MODULAR (8″x2″x4″) BRICKS WITH ⅜” JOINTS
NO. OF BRICKS | 26 | 52 | 88 | 114 | 140 | 166 | 500 | 800 | 1450 |
NO. OF BAGS | 1 | 2 | 3 | 4 | 5 | 6 | 19 | 30 | 56 |
NUMBER OF 80LB BAGS OF U-MIX MORTAR MIX REQUIRED TO LAY 8″ STANDARD BLOCKS WITH ⅜” JOINTS
NO. OF BLOCKS | 10 | 21 | 31 | 42 | 52 | 63 | 100 | 200 | 440 |
NO. OF BAGS | 1 | 2 | 3 | 4 | 5 | 6 | 9 | 18 | 42 |
NUMBER OF 80LB BAGS OF U-MIX MORTAR MIX REQUIRED TO LAY STANDARD MODULAR (8″x2″x4″) BRICKS WITH ⅜” JOINTS
NO. OF BRICKS | 34 | 68 | 102 | 136 | 170 | 204 | 500 | 800 | 1400 |
NO. OF BAGS | 1 | 2 | 3 | 4 | 5 | 6 | 15 | 24 | 42 |
PREPARATION:
TOOLS YOU MAY NEED:
DIRECTIONS FOR MIXING:
FOR BEST RESULTS:
Use only when temperature is 40° and rising. In cold weather use warm, not hot, water for mixing.
Dampen the block or the repair area before applying the new mortar to prevent premature drying of the new material.
Keep the new mortar damp for at least three (3) days by occasional fine spraying with water.