
U-MIX® Sand Mix
60 lb / 80 lb
#67744 / #67732
|
|
60 lb BAG COVERAGE:
80 lb BAG COVERAGE:
PREPARATION:
TOOLS YOU MAY NEED:
DIRECTIONS FOR MIXING:
FOR BEST RESULTS:
Use only when temperature is 40° and rising. In cold weather use warm, not hot, water for mixing.
Apply freshly mixed U-MIX® Sand Mix immediately. Do not retemper the mix after initial mixing.
When patching or resurfacing, it is important to dampen the surface of the existing concrete before applying the new material. The use of quality bonding agents in recommended.
Allow the new concrete to set firmly, then keep moist for at least three (3) days by applying an occasional fine spray with water. Covering the surface with plastic film or damp burlap is also beneficial.